Previous

Lyngford Light Railway - A 5 inch gauge garden railway

Next

Other pages in this series:

2002 Introduction Part 1 Dec21st Part 2 Dec 22nd Part 3 Dec 24th Part 4 Dec 27th
2003 Part 5 Jan 1st Part 6 Feb 25th Part 7 Mar 7th Part 8 Mar 13th Part 9 March 29th
  Part 10 April 5th & 6th Part 11 April 8th Part 12 August    

No 3's Construction pages Part Two

.

December 22nd 2002

I have got on well today! The coupling rods and motor mounts have been finished and painted, along with the spring stops and axle box keeper plates. The cranks have been drilled ready to be tapped for the grub screws. The motors have had the shaft ends trimmed and gear wheels and shafts have been drilled for the key pins (only broke two drill bits-not bad seeing as I only have a Black&Decker drill mounted in a drill press, these are not renowned for their accuracy!)

Previous   Next
Home Track Tour Loco's Rolling Stock Links
Weirdie Alice No. 3

Email me at

©Terry Bowden. 2002/2003       Last updated 13 April 2005